Recent posts
F2280 computer configuration
Electricity and voltage standard:
1.The power supply requires 220v, and the voltage unstable area needs to be equipped with a regulated power supply.
2.The ground wire must be installed (2.5-square wire is required when installing the ground wire, one end is connected on the machine, and one end is connected on the steel bar. The steel bar needs to be 1 meter long, 6mm wide and buried in the ground.take a pack of salt. Watering the water into the soil along the steel bars, and then filling the ground and compacting it.)Use salt water to pour the steel into the soil, and then fill the ground and compact it.Please consult a professional electrician for other installation precautions.
3.The circuit of the heating box and the printing machine are required to be separated.
4.The circuit of the heating box needs to install leakage switch 63C and needs 6 square lines.
5. The power supply of the printer is divided into two channels, the voltage is 220V, the leakage switch is 63A, one is connected to the printer, the other is connected to the printer drying power supply. Need 6 square wires.
6.The heater voltage is three-phase, 380 volts. 8 or 10 square wires required. 63c leakage protector is required
7.After installed circuit,need to measure voltage.